EXTENSION AUDIT

GARAGE CONVERSION AUDIT

STRUCTURAL LOFT CONVERSION AUDIT

PRE-PURCHASE FEASABILITY CONSULTATION

TEMPORARY WORKS

STEEL WORK CONNECTIONS

SITE VISIT  

INTERIOR MINOR ALTERATIONS

CDM & ASSOCIATED REPORTS

HEALTH & SAFETY REPORTS 

3D MODELLING (from)

PROJECT MANAGEMENT  

SOIL INVESTIGATION REPORTS

AIR PRESSURE TESTING

SOUND TESTING

BUILDING CONTROL APPLICATIONS

AIR TIGHTNESS TESTING

SOUND INSULATION TESTING

PART F VENTILATION TESTING

RENEWABLE ENERGY ADVICE & INSTALL

ENERGY STATEMENTS

THERMOGRAPHIC SURVEYS & TESTING

CODE FOR SUSTAINABLE HOMES

PART G WATER CALCS

DOMESTIC EPC’S FOR LANDLORDS & HOMEOWNERS

How to Get Your Construction Project Done Faster

April 7, 2025

The Design & Build Advantage

Time is one of the biggest assets in any construction project—and delays can quickly eat into budgets, create stress, and push back your plans. At STAAC, we believe in building smarter, not slower. That’s why we follow the Design & Build model, a streamlined approach that helps us get your project done faster and more efficiently.

By combining design and construction into one unified team, we eliminate the back-and-forth that slows down traditional builds. The result? A smoother process, fewer delays, and quicker delivery—without compromising quality.

Let’s explore why Design & Build is a smarter route when time is of the essence.

1. Streamlined Communication = Faster Decisions

With design and construction teams working collaboratively from day one, there’s a unified flow of information. Questions are answered quicker, design tweaks are implemented in real-time, and approvals don’t get lost in back-and-forth emails. This kind of cohesion is a major accelerator in the early planning and design phases.

2. Overlapping Phases = Early Start on Construction

In traditional design-bid-build models, construction doesn’t begin until the full design is completed and approved. In contrast, design-build allows for overlapping phases—meaning site prep or foundational work can begin while design details are still being finalized.

This can shave weeks or even months off the project timeline.

3. Reduced Bidding & Procurement Time

Design-bid-build projects often involve lengthy bidding processes to select a contractor. In design-build, that step is eliminated. With one team responsible for the entire process, procurement becomes faster and more focused. Materials and subcontractors can be sourced earlier, avoiding market delays and price spikes.

4. Fewer Change Orders = Fewer Delays

Because design-build encourages early collaboration and real-time feedback, the risk of costly and time-consuming change orders is significantly reduced. Everyone—from the architect to the contractor—is on the same page from the start, which translates into a smoother execution.

5. Improved Risk Management

Delays often come from disputes over design interpretation or responsibility. The single-point accountability of design-build removes the blame game. One team, one goal—minimising delays caused by conflict or confusion.

6. Faster Project Delivery = Faster Occupancy

Whether it’s a new home, commercial space, or extension, faster project completion means earlier move-in. For property developers or homeowners looking to rent or sell quickly, the timeline advantage can lead directly to faster returns on investment.

Fast-Track Your Project with STAAC

At STAAC, we’ve seen firsthand how the design-build approach leads to faster, more efficient projects—without sacrificing creativity or quality. When time matters, collaboration isn’t just beneficial—it’s essential.

By choosing a design-build partner, you’re not only streamlining your project—you’re aligning it for success from the very beginning.

Get in touch today to book a chat and take the first step towards making your ideas a reality.